www.rosebower.com
Home of Rosebower Development Sdn BhdHome  | Bookmark Rosebower Development Sdn Bhd WebsiteBookmark | Printer FriendlyPrint This Page | Contact Rosebower Development Sdn BhdContact 
Welcome to rosebower.com
Board of Directors


Carol Lim Siew Hong
Managing Director
B. Econ (Hons) University of Malaya, Kuala Lumpur


Experiences :

Construction

  1. Employed by Bolton Properties Berhad between 1977-1979, and was responsible for the Contract Administration, Site Coordination and Cost Control of some of the major projects amounting to RM50 million.
  2. Served as a director of The Rosebower Sdn. Bhd. since 1985 and was responsible for the planning, tendering and contract management of the construction projects undertaken by the Company.
  3. Served as director of Rosebower Synergy and was responsible for planning, strategizing and management of smart card and IT projects undertaken by the company.
Among the construction projects undertaken by the Company were:
  • The Rehabilitation of Terminal 2 in Subang as a Domestic Airport in time for CHOGM 1989.
  • The Construction and Completion of various projects at University Utara Malaysia from 1990 - 1991, namely the upgrading of 6 blocks of hostels to 5-Star hotel status, the Aluminium Works, Glazing, Partitions, Built-in Joinery Fittings and Furnishing for the Library and Administration Block amounting to RM4.2 million.
  • Where Civil Works are concerned, the company was involved in the Demolition and Construction of the historical Sg. Krian bridge in 1992; a composite steel bridge spanning 170 meters and weighing 1,300 MT across the Sg. Krian in Seberang Prai, Penang; the construction of the approaching roads to the Sg. Krian Bridge as well as the service and pedestrian crossings across the river (enclosed is a relevant article from the Star dated 14th August 1991).
  • In November 1993, the company was involved in the construction and completion of dredging and breakwater works for Rebak Island Marina Resort, Langkawi where dredging of the rocky shoreline involved removing rockbed from the seabed up to a depth of -3.75m ACD; in a rushed construction program due to LIMA 1993. Subsequent to that, the breakwater was constructed to protect the marina basin from open seas and was completed in March 1994.
  • The Company was also involved in our own in-house project to construct 122 houses and surrounding infrastructure on Lots 1722, 1723, 1724 and 1730 in Mukim 14, Seberang Prai Tengah, Pulau Pinang, with the completion date being December, 1995.
  • The Company was the main turnkey contractor for the MSC Central Incubator project in Cyberjaya where the RM15 million project was completed in 90 days.


Judy Lim Siew Yeoh
Pengurus Pentadbiran
Sijil Pelajaran Malaysia dan Sijil Kesetiausahaan, Malacca Tutorial College.


Experiences :

Sebagai seorang Pengurus Pentadbiran di The Rosebower Sdn.Bhd., beliau bertanggungjawab dalam memastikan kerja-kerja pengurusan dan perlaksanaan projek-projek syarikat antaranya:

  • Kerja-kerja Meroboh Jambatan Lama dan Pembinaan Jambatan Baru Sg. Krian dilaluan Persekutuan 1, Seberang Perai Selatan, Pulau Pinang pada tahun 1992 iaitu sebuah jambatan keluli sepanjang 170 meter dan seberat 1300 tan metrik termasuk pembinaan jalan dan laluan pejalan kaki merentagi sungai tersebut.
  • Pembinaan dan penyiapan kerja-kerja “Dredging and Breakwater Works’ di Pulau Rebak Marina Resort, Langkawi, Kedah dimana kerja-kerja mengeluarkan batu dari dasar laut telah dilakukan sedalam –3.75m ACD, sebagai persiapan untuk LIMA 1993. Selepas itu “Breakwater telah dibina pada tahun 1994 bagi melindungi kawasan marina daripada arus lautan.
  • Penyiapan projek perumahan sebanyak 122 unit Rumah Teres Setingkat Diatas Lot 1722, 1723, 1724 dan 1730, Mukim 14, Seberang Perai Tengah, Pulau Pinang pada tahun 1995.
  • Pembinaan dan penyiapan sebuah pusat Incubator secara turnkey diatas sebahagian lot PT12197 dan 3219 di Universiti Multimedia Telekom, Bandaraya Cyberjaya, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan.
Welcome to rosebower.com

Copyright ©2014 Rosebower Development Sdn Bhd. All Rights Reserved.
Website by Altruism